For purchases and remortgages, Fox Davidson can secure a rate for you now. We can then review rates for you before completion and if they have dropped we will request the lender moves you to the lower rate. Get in Touch

Case Studies

£2.2m Conversion Finance for Nine Apartments on the Ancoats Fringe, Manchester

Conversion Finance
4 min read

A £2.2 million conversion facility for a former light industrial and office building on the fringe of Ancoats and the Northern Quarter, turned into nine apartments with a gross development value of around £3.3 million, putting the loan at about 67% of GDV. The location brought the demand, and the cost pressure came from the building itself, with heritage elements to keep and acoustic standards to meet before it could become homes.

Deal snapshot
Location Ancoats and Northern Quarter fringe, Manchester
Loan amount £2,200,000
GDV (approx) Around £3,300,000
Loan to GDV (approx) About 67%
Project Light industrial and office building converted to 9 apartments

The situation

The building sat on the fringe of Ancoats and the Northern Quarter, a mixed light industrial and office property in a part of Manchester that has changed enormously in recent years. The client’s plan was to convert it into nine apartments, and the facility needed to be £2.2 million against a finished value of around £3.3 million.

Ancoats has become a place where creative businesses and young professionals want to live and work, and that kind of demand gives a lender comfort on the exit whether the finished flats are sold or let. Strong rental and sales demand in the area was the main strength of the case when we presented it, and I made sure the lenders could see it clearly before they started looking at the building.

The building

Conversions of older commercial buildings are rarely simple, and this one had heritage elements that had to be kept and worked around rather than stripped out. Those features are part of the appeal of the finished apartments in this part of Manchester, where buyers and tenants like a building with some character, but they also limit how freely the contractor can work and they push up the cost of doing the job properly.

Our first question on any building like this is what can and cannot be touched, because that shapes the layout, the build method and the budget, and a lender’s monitoring surveyor will ask the same question before signing off the cost plan.

What went well

The location carried the scheme. A creative and professional neighbourhood with strong demand from both renters and buyers gave the project a clear exit story, which made the case straightforward to put in front of lenders. In my experience a credit team relaxes a good deal when demand in the immediate area is obvious, and on the Ancoats fringe it is hard to miss.

Having two credible routes out, sale or rental, also matters on a conversion of this size, because it gives the developer options if the sales market slows while the works are going on.

The challenge

The works budget grew. The heritage elements of the existing building needed more careful, and more expensive, treatment than a plain shell would have done, and the acoustic requirements for residential use added further cost on top. Turning a building designed for commercial use into homes means bringing sound insulation between floors and between apartments up to the standard Building Regulations expect for flats, and in an older structure that often means new floor build-ups, upgraded separating walls and careful detailing around pipes and ducts.

Acoustic work is one of the costs I see underestimated most often on commercial to residential schemes. It does not show up on a walk round, the client’s appraisal is usually built on a cost per square foot for a standard conversion, and then the acoustic consultant reports and the number moves. My advice is to get acoustic and heritage advice in before the works budget is fixed, so the figure the lender sees is the figure the build will need.

How the finance was structured

As general context, conversion development finance works much like ground-up funding. The lender advances part of the purchase price or existing value at the start and releases the works money in monthly stages against progress certified by a monitoring surveyor, with interest charged on what has been drawn and the loan repaid from sales or a refinance once the units are complete.

The structure is tested hardest when the works budget moves, because the lender is funding against an agreed cost plan and any rise in costs has to be met from somewhere. That is why contingency and an honest budget at the outset count for so much on heritage conversions, and why I push clients to show their working on costs before a lender’s surveyor starts asking the questions.

The outcome

The scheme delivered nine apartments in one of Manchester’s most wanted neighbourhoods, funded by a £2.2 million facility at about 67% of a GDV of around £3.3 million. The heritage and acoustic work pushed the works budget up, and the strength of rental and sales demand in the area is what kept the scheme attractive throughout.

The outcome

A £2.2 million conversion facility at about 67% of GDV funded the change of a light industrial and office building into nine apartments worth around £3.3 million. Demand from creative and professional buyers and tenants on the Ancoats fringe was the strength of the deal, while heritage features and residential acoustic standards were the reason the works budget rose.

Frequently asked questions

How does development finance work on a commercial to residential conversion?

The lender usually advances part of the purchase price or current value on day one and releases the conversion budget in stages against work certified by a monitoring surveyor. Interest is charged on the drawn balance, and the facility is repaid from the sale of the finished units or a refinance onto longer-term finance once they are let.

Do heritage features affect conversion finance?

Lenders will fund buildings with heritage features, but they want the works budget to reflect the extra care those features need, and the monitoring surveyor will check that the cost plan is realistic. Where the building is listed or in a conservation area, any consents needed should be in place before the works money is released.

Why do acoustic requirements matter when converting a building to flats?

When a commercial building becomes flats, the walls and floors between homes have to meet Building Regulations standards for sound insulation, which older commercial structures rarely achieve without upgrading. The cost of that work should be in the appraisal from the start, because Building Control sign-off is needed before the units can be sold or let.

Completed transaction. This case study describes a live deal arranged by Fox Davidson. Client details are anonymised and figures rounded.

Rates and lending criteria are subject to change by lenders without notice. Your property may be repossessed if you do not keep up repayments on a mortgage or any other debt secured on it.

We arrange conversion development finance from £250,000 across England, Scotland and Wales, including Manchester and the wider North West, with the works budget and the exit set out properly before the case goes to lenders.

Call 03300 100313

*Minimum loan for Scotland bridging, commercial and development finance cases is £1,000,000, on mainland Scotland in and around Glasgow, Edinburgh and other major cities. We do not arrange finance in Northern Ireland.

Get in Touch

Recent case studies

Loading...

Get in Touch