£4.6m Development Finance for 12 Apartments in Salford

Development Finance
4 min read

A £4.6 million senior development facility for a ground-up scheme of 12 apartments on the edge of Salford, at about 67% of an approximate £6.9 million GDV. A regenerating location with good transport links drew solid off-plan interest, and the pressures on the deal were build-cost inflation on materials and labour and the need to coordinate shared access with neighbouring developments.

Deal snapshot
Location Salford, Greater Manchester, on the edge of the city
Loan amount £4,600,000 senior development facility
GDV (approx) Around £6,900,000
Loan to GDV (approx) About 67%
Project Ground-up scheme of 12 apartments

The situation

Salford has changed almost beyond recognition over the past twenty years, and the edge of the city where it meets Manchester is now one of the busiest development patches in the North West. Our client had a ground-up scheme of 12 apartments in a regenerating part of that area, close to good transport links, and needed £4.6 million of development finance against a gross development value of around £6.9 million, which is about 67% of GDV.

Twelve apartments is a mid-sized scheme. It is big enough to interest the established development lenders and small enough that the developer is still close to every decision on site, which in my experience is a good combination when something on the build needs a quick answer.

Why the location worked

Regeneration areas cut both ways for a lender. The upside is that values in an improving area tend to follow the investment going into it, and good transport links into the city centre keep buyers and tenants interested. The caution is that a lender has to be satisfied the GDV is supported by values being achieved today, with any future uplift from the regeneration story left out of the numbers.

This scheme had solid off-plan interest, and that gave the appraisal real support. Off-plan interest on an apartment scheme tells a lender the price points work for actual buyers in that location, and across a dozen units that evidence goes a long way when credit is deciding how comfortable it is with the exit.

Build-cost inflation

Build-cost inflation on materials and labour was the first pressure on this deal. Apartment schemes are more exposed to rising costs than houses, because the frame, the envelope and the mechanical and electrical work make up a large share of the budget, and the specialist trades for that work have been in short supply in recent years.

What I have learned on schemes like this is that contingency is the first line of defence and the developer’s own cash is the second, and lenders want to know both are there before they commit. A cost plan tested by a quantity surveyor, with fixed prices on the main packages wherever they can be secured, makes a credit team far more comfortable than an estimate that relies on prices holding steady for the length of the build.

Shared access with the neighbours

The second pressure was coordination with neighbouring developments on shared access. In a regenerating area it is common for several schemes to be going up at once, and where sites share an access road or a construction route, delivery slots, crane positions, road closures and the order of works all have to be agreed between parties who each have their own programme to protect.

It is the kind of issue that never appears in an appraisal and can still hold up a site. Lenders want to see access rights documented properly for the build and for the finished building, because buyers’ solicitors will ask exactly the same questions later and a mortgage lender will not lend on a flat without clear legal access.

How a facility of this size generally works

On a ground-up apartment scheme, a senior development facility typically funds part of the land on day one and releases the build money monthly against certificates from the lender’s monitoring surveyor, with interest charged on the funds drawn. That is general context, and the detail on any facility is set by the lender and the scheme.

On a 12-unit block the monitoring surveyor’s reports carry a lot of weight, because cost pressure shows up there first. A developer who keeps the surveyor informed about price movements and programme changes, and does not wait for the next site visit to raise them, tends to have a far easier relationship with the lender when the numbers move.

The outcome

The scheme went ahead on a £4.6 million facility at about 67% of GDV, in a regenerating location where good transport links and solid off-plan interest gave the numbers real support. Build-cost inflation and the shared-access coordination were the issues the developer had to manage through the build.

The outcome

A £4.6 million senior development facility at about 67% of an approximate £6.9 million GDV for 12 apartments on the edge of Salford. A regenerating location with good transport links and solid off-plan interest supported the scheme, while rising material and labour costs and shared access with neighbouring developments were the pressures managed through the build.

Frequently asked questions

How do development lenders deal with build-cost inflation?

Lenders fund against a cost plan reviewed by their monitoring surveyor and expect a contingency, commonly around 5% to 10% of build costs on new build. If costs rise beyond the contingency the developer is normally expected to fund the difference before further drawdowns are released, which is why fixed-price contracts and a realistic contingency matter so much on apartment schemes.

Does off-plan interest help with a development finance application?

Yes. Reservations and off-plan interest show the lender and the valuer that the unit prices in the appraisal are achievable, which supports the GDV and the exit. Some lenders will also take a more favourable view of the gearing where a meaningful share of the units are reserved before or during the build.

Why does shared access matter to a development lender?

The lender’s security is only as good as the access to it. Lenders and their solicitors check that the site has legal rights of way for construction and for the finished building, and that any shared roads or services are covered by proper agreements, because buyers’ mortgage lenders will need the same comfort when the units are sold.

Completed transaction. This case study describes a live deal arranged by Fox Davidson. Client details are anonymised and figures rounded.

Rates and lending criteria are subject to change by lenders without notice. Your property may be repossessed if you do not keep up repayments on a mortgage or any other debt secured on it.

We arrange senior development finance from £250,000 across England, Scotland and Wales, including apartment schemes in Salford and across Greater Manchester.

Call 03300 100313

*Minimum loan for Scotland bridging, commercial and development finance cases is £1,000,000, on mainland Scotland in and around Glasgow, Edinburgh and other major cities. We do not arrange finance in Northern Ireland.

Get in Touch

Recent case studies

Loading...

Get in Touch