£2.1m Development Finance for Five Houses in Aylesbury

Development Finance
4 min read

A £2.1 million senior development facility for five three and four-bedroom houses in Aylesbury, Buckinghamshire, at about 66% of an approximate £3.2 million GDV. Planning was straightforward and the local family-home market is solid, but ground conditions on the site called for deeper foundations and piling, which extended the programme and increased costs.

Deal snapshot
Location Aylesbury, Buckinghamshire
Loan amount £2,100,000 senior development facility
GDV (approx) Around £3,200,000
Loan to GDV (approx) About 66%
Project Ground-up build of five 3 and 4-bed houses
Planning route Planning permission, straightforward

The situation

Aylesbury has grown steadily as the county town of Buckinghamshire, and the demand for family houses has grown with it. Our client had a site for five houses, a mix of three and four bedrooms, and needed £2.1 million of development finance against a gross development value of around £3.2 million.

That put the facility at about 66% of GDV, which sits comfortably within the range senior development lenders work to and gave us a clean case to take to market.

A market that suits family houses

The local family-home market is solid, and a mix of three and four-bedroom houses gives a developer more than one type of buyer in the same town, from a family moving up from their first home to one that needs the extra bedroom.

Lenders and valuers tend to like this kind of scheme because the comparable evidence is plentiful and the finished product is what a large part of the local market is looking for. The GDV is easier to test, the sales rate is easier to judge, and that confidence shows up in how a credit team approaches the deal.

What went well

Planning was straightforward. That sounds like a small thing to write down, but I have seen plenty of five-unit schemes lose months to conditions, design changes and objections before a penny of build money can be drawn, and every month lost costs the developer interest and holding costs.

A clean route through planning meant the conversation with lenders could focus on the build, the costs and the market, which is where it should be on a scheme of this size.

Ground conditions and piling

The challenge came from below ground. The ground conditions on the site required deeper foundations and piling, and that extended the programme and increased costs. As general context, piling means driving or boring columns into the ground to carry the weight of the building down to firmer strata, and it brings in a specialist contractor, a piling rig, test results and design work from a structural engineer, all of which add time and money.

What we have seen across ground-up schemes is that ground conditions are one of the most common reasons a build budget moves in the early weeks, and they are also one of the easiest risks to reduce in advance. A proper site investigation with trial pits or boreholes before the land is bought, or at the latest before the cost plan is fixed, tells the developer and the lender what the foundations will really need.

Foundation problems also hurt more than their cost suggests. They arrive at the start of the programme, before any value has been added to the site, so they eat into contingency at the point where the developer has the least room to absorb them, and every later stage of the build moves back with them.

How the facility works on a ground-up scheme

A senior development facility on a scheme like this generally funds part of the land on day one and releases the build money in stages against certificates from the lender’s monitoring surveyor, with interest charged only on what has been drawn. If costs rise, the lender will normally look to contingency and the developer’s own funds first. That is the general shape of the product; the detail on any facility depends on the lender and the scheme.

Anyone taking out development finance on a greenfield or infill site needs to be talking to their structural engineer as early as they talk to their broker, because the foundation design is one of the few costs that can be pinned down properly before the facility is agreed.

The outcome

Five family houses were funded with a £2.1 million senior facility at about 66% of an approximate £3.2 million GDV. Straightforward planning and a solid local market made the case clear to present, and the deeper foundations and piling extended the programme and added cost along the way.

The outcome

A £2.1 million senior development facility at about 66% of an approximate £3.2 million GDV for five three and four-bedroom houses in Aylesbury. Straightforward planning and a solid family-home market supported the scheme, while ground conditions required deeper foundations and piling that extended the programme and increased costs.

Frequently asked questions

What happens to development finance if a site needs piling?

Piling adds cost and time, so lenders want it reflected in the cost plan and programme reviewed by their monitoring surveyor. If the need for piling is found after the facility is agreed, the extra cost is normally met from contingency or the developer’s own funds first, and any increase to the facility depends on the remaining headroom against cost and GDV.

Should I get a site investigation before applying for development finance?

It is strongly advisable. A ground investigation with trial pits or boreholes shows the soil type, groundwater and any contamination, which lets the structural engineer design the right foundations and the quantity surveyor price them. Lenders take more comfort from a cost plan built on site investigation results than one built on assumptions.

Do I need planning permission before applying for development finance?

For a ground-up development facility, in most cases yes. Senior development lenders lend against a consented scheme, and while some will issue terms subject to planning, build funds are not released until a satisfactory permission is in place and pre-commencement conditions are dealt with. Where a site is bought before consent, a bridging loan is often used for the purchase and refinanced onto development finance once planning is granted.

Completed transaction. This case study describes a live deal arranged by Fox Davidson. Client details are anonymised and figures rounded.

Rates and lending criteria are subject to change by lenders without notice. Your property may be repossessed if you do not keep up repayments on a mortgage or any other debt secured on it.

We arrange senior development finance from £250,000 across England, Scotland and Wales, including housing schemes in Aylesbury and across Buckinghamshire.

Call 03300 100313

*Minimum loan for Scotland bridging, commercial and development finance cases is £1,000,000, on mainland Scotland in and around Glasgow, Edinburgh and other major cities. We do not arrange finance in Northern Ireland.

Get in Touch

Recent case studies

Loading...

Get in Touch