A £1.45 million senior development facility for six three bed family houses on a former industrial plot in Swansea, Wales, at about 66% of a GDV of around £2.2 million. Low entry costs and solid local demand for family housing made the scheme work, with ground contamination from the previous use and a slower sales pace than South East markets the two issues to plan around.
| Location | Swansea, Wales |
| Loan amount | £1,450,000 |
| GDV (approx) | Around £2,200,000 |
| Loan to GDV (approx) | About 66% |
| Project | Ground up build of six three bed houses on a brownfield plot |
| Exit | Sales of the completed houses |
The situation
This was a brownfield plot in Swansea, previously in industrial use, with a plan for six three bed houses built from the ground up. We arranged a senior development facility of £1.45 million against a gross development value of around £2.2 million, which put the loan at about 66% of GDV.
Schemes in South Wales often come to us from developers who know their local market well. The appeal of this one was the affordable entry cost, both for the land and for the eventual buyers, and there was solid local demand for family housing to support the end values.
What made the numbers work
Affordable entry costs were the strength of this scheme. Land in Swansea costs a fraction of what a similar plot would cost in the home counties, and that gives the developer room in the appraisal that a South East scheme often does not have. A three bed family house is also the bread and butter of the local market, the type of home that young families and people moving up from flats are looking for, so the GDV did not depend on a niche buyer.
Lenders like a scheme where the product matches the market. When I put a case like this together I spend time on the comparables, finding recent sales of similar houses close to the site, because a valuer outside the South East will want to see local evidence and the lender will lean on that valuation.
The challenge: contamination and sales pace
There were two challenges, and they sat at opposite ends of the scheme. At the start, the plot had ground contamination from its previous industrial use, and at the end, sales moved more slowly than they would in South East markets.
Speaking generally, contamination on a former industrial site is dealt with through a site investigation, a remediation strategy agreed with the council and then verification once the clean-up is complete, and the planning permission will usually carry conditions requiring each of those steps. The cost and time involved depend on what is found in the ground, and that is why lenders expect the site investigation report before they commit and want the remediation priced in the cost plan.
Sales pace is a different kind of risk. Demand for family housing in Swansea was solid, but buyers take longer to commit and there are fewer of them chasing each house than in a commuter town outside London. What we usually do on schemes outside the South East is make sure the facility term gives enough room for the sales to come through at a realistic pace, so the developer is not pushed into cutting prices on the last houses to meet a deadline.
How a brownfield facility is usually structured
In general terms a senior development facility advances part of the land cost on day one and releases the build money in stages as the monitoring surveyor certifies the work on site. On a brownfield plot the remediation is normally treated as an early stage of the build, funded and certified in the same way as the groundworks, and the lender will want the verification report before the later stages are released.
Brownfield land is not always the best solution for a first scheme, but for a developer who understands the ground and the local market it can be very good value, and lenders who fund regularly in Wales are used to seeing it.
What I took from it
What I have noticed is that developers in South Wales often underestimate how attractive their schemes look to lenders when the land cost is low and the houses suit the local market. The slower sales pace has to be built into the plan, and the contamination has to be properly investigated and priced, but with those two things handled the scheme carries itself.
The outcome
A £1.45 million senior development facility at about 66% of a GDV of around £2.2 million for six three bed houses on a brownfield plot in Swansea. Affordable entry costs and solid local demand for family housing worked in the scheme’s favour, while ground contamination from the previous industrial use and slower sales than South East markets were the challenges it had to absorb.
Frequently asked questions
Can I get development finance on a contaminated brownfield site?
Yes. Development lenders regularly fund brownfield schemes, provided there is a site investigation report, a remediation strategy agreed with the council where planning requires one and a cost plan that includes the clean-up. The lender will usually want the verification report confirming the remediation before releasing later stages of funding.
Do lenders treat development finance in Wales differently from England?
The basic structure of a development facility is the same, but lenders look closely at local sales evidence and realistic sales rates. Schemes outside the South East can have lower land costs and good margins, and the facility term should allow for the sales pace of the local market.
How long should a development finance term allow for sales?
The term usually covers the build programme plus a period for selling the completed homes. In markets where sales move more slowly, building in a longer sales period protects the developer from having to discount the final units to repay the facility before it expires.
Completed transaction. This case study describes a live deal arranged by Fox Davidson. Client details are anonymised and figures rounded.
Rates and lending criteria are subject to change by lenders without notice. Your property may be repossessed if you do not keep up repayments on a mortgage or any other debt secured on it.
We arrange senior development finance from £250,000 across England, Scotland and Wales, including brownfield and family housing schemes in South Wales.
*Minimum loan for Scotland bridging, commercial and development finance cases is £1,000,000, on mainland Scotland in and around Glasgow, Edinburgh and other major cities. We do not arrange finance in Northern Ireland.