Case Studies

£1.5m Regulated Bridge to Repay the Mortgage and Refurbish a £1.9m Wiltshire House Before Sale

Regulated Bridging
7 min read
Deal snapshot
Location Near Marlborough, Wiltshire
Property £1,900,000 Georgian former rectory in a dated condition; agents advised £1.8m as a realistic as-is sale price
Post-works valuation £2,350,000 (two agents and the lender’s valuer)
Existing mortgage £900,000 repaid from the bridge
Facility (gross) £1,500,000 regulated first charge, including £180,000 of staged works funding and a 12-month rolled interest allowance
Gross LTV Day-one drawdown £1.26m at 66% of the pre-works value; facility limit 64% of the post-works value
Term 12 months, regulated
Interest structure Rolled up, no monthly payments
Rate band Specialist regulated refurbishment band, 1.0% to 1.25% a month
Exit Sale after works; completed at £2,300,000 in month eight
Time to completion 19 working days from first call
Key challenge Owners emigrating six weeks after completion, works to be run from abroad, existing lender unwilling to fund works or consent to the move

Rates and lender criteria are subject to change. Figures correct at time of publication. Always speak to your broker for up-to-date rates and lending criteria on your specific case.

The situation

A couple relocating to Singapore used a £1.5m regulated bridging loan to repay the £900,000 mortgage on their £1.9m Wiltshire home and fund £180,000 of works before marketing it, and sold the finished house for £2.3m in month eight against an as-is price of £1.8m. He had accepted a three-year posting in January 2026 and had to be in Singapore by the middle of March. The house, a Georgian former rectory outside Marlborough, had been their home for eleven years and had not been touched in that time. The kitchen and three bathrooms dated from the late 1990s. The roof needed work on one elevation. The garden had got away from them.

Three agents valued it. All three said the same thing in slightly different words: in its current state it would sell for £1.8m to a buyer who wanted a project and would price the works in twice, and with a competent refurbishment it was a £2.3m to £2.4m house in a market with very little of that quality for sale. The gap between the two numbers was more than half a million pounds. The works they costed came to £168,000 on a fixed-price contract plus contingency.

They did not have £180,000 in cash sitting idle, they were about to start paying rent in one of the most expensive cities in the world, and their mortgage lender had made it clear it would neither fund the works nor be comfortable with the borrowers leaving the country while the loan ran.

Why a mortgage or the high street could not do it

The existing lender declined a further advance for the works because the borrowers were about to become non-UK resident with no UK income, and every other mainstream lender said the same. Their mortgage was on a five-year fixed rate that had six months left to run, with monthly payments of a little over £4,600 that would have to be serviced from a Singapore salary in a foreign currency through an eight-month sale process. A high street further advance is assessed on UK income under the FCA’s mortgage conduct rules, and a borrower leaving the country in six weeks has none.

The alternative was to sell as it stood. At £1.8m, after redeeming the mortgage and paying the agent, they would have walked away with around £880,000 and watched a developer or a well-advised buyer bank the difference. They had the time, because the posting was three years, and they had the equity. What they lacked was a lender prepared to fund works on a house that was about to be empty, owned by people on the other side of the world.

Regulated refurbishment bridging exists for exactly this case. The loan is secured on the borrowers’ home, so it is regulated by the FCA under the mortgage rules even though the borrowers are moving out, and the lender assesses the exit rather than the income. In the cases we place, lenders are far more relaxed about a borrower working abroad than people expect, provided there is a UK solicitor, a UK-based person managing the works and a sale as the exit rather than a refinance that would need UK income.

The structure

We arranged a £1.5m regulated refurbishment bridging facility with a specialist regulated lender that releases works funding in stages against a valuer’s sign-off, on a 12-month term with interest rolled up. The day-one drawdown was £1.26m, which is 66% of the £1.9m pre-works valuation. That repaid the £900,000 mortgage, paid the 2% arrangement fee, released the first £60,000 works tranche to the builder and left the couple with £270,000 in cash to cover the relocation, the rent deposit in Singapore and the works contingency.

Two further works tranches of £60,000 each were released at months two and four, after the lender’s valuer confirmed the roof, the first-fix electrics and the kitchen installation had been completed to the schedule. The facility limit of £1.5m included a rolled interest allowance for the full twelve months, and the lender tested that limit against the £2.35m post-works valuation at 64% loan to value rather than against the day-one figure. That is the mechanism that lets a refurbishment bridge go further than a standard regulated bridge on the same house, and it is why the valuer’s post-works number matters more than the pre-works one.

Rolled-up interest meant no payments from Singapore and no exchange rate risk on a monthly debit. Interest accrued at the specialist refurbishment band because of the gearing and the works risk, and it only accrued on money that had been drawn, so the undrawn tranches cost nothing until they were released. The couple appointed a local project manager with a limited power of attorney for the works and the sale, which the lender required and which turned out to be the best £9,000 they spent.

The exit, as we modelled it

The exit was the sale of the finished house, modelled at £2.3m on a six-month marketing period starting in month four, and stressed at £2.0m and twelve months. On the base case the facility balance at month eight, with all three tranches drawn and eight months of rolled interest, came to a little under £1.49m, which left just over £810,000 of sale proceeds to the couple on top of the £270,000 released on day one. On the stressed case, a sale at £2.0m in month twelve still cleared a facility balance of just under £1.5m with £500,000 to spare.

We set those numbers next to the as-is alternative. Selling in January at £1.8m would have netted around £880,000 after the mortgage and agent. The refurbishment route, on the base case, netted around £1.06m after the mortgage, the works, the interest, the fee and the agent, and it also removed eight months of £4,600 mortgage payments paid in Singapore dollars. The margin was around £180,000 before counting the payments saved, and on the stressed case it roughly broke even against selling as-is, which is the number the couple needed to see before they committed.

What we told the client

We told them to sign the fixed-price building contract before completion, with the schedule of works attached to the lender’s valuation instruction, so the valuer and the builder were working from the same document. The single most common reason a staged drawdown gets delayed is a valuer who cannot match what has been built to what was promised.

The blunt observation we gave them is that in most of the refurbish-before-sale enquiries we receive the works would not move the price far enough to cover the cost of the works plus eight to twelve months of interest, and we say so and send people away, whereas here three agents had independently put the gap at more than half a million pounds and the arithmetic made the case before we did. A refurbishment bridge is a tool for a specific situation, which is a tired house in a price band where finished stock is scarce, and it is a poor tool for a house that just needs a coat of paint.

The trend behind this case is one we see more of each year: owners who have the equity to improve a house but not the liquidity, who are leaving for work or downsizing and who would otherwise hand the uplift to whoever buys it from them. Bridging lets them keep that uplift and pay for it out of the sale.

The timeline

Day 1: first call, seven weeks before the flight. We took details, agreed the schedule of works with the couple and their builder, and had indicative terms from two regulated refurbishment lenders within 24 hours. Day 2: decision in principle. Day 4: valuation instructed with the schedule of works and the builder’s fixed-price quote attached. Day 9: valuation received, £1.9m as-is and £2.35m on completion of the scheduled works. Day 11: formal offer. Days 12 to 18: legal work, including the limited power of attorney for the project manager and the redemption statement from the existing lender. Day 19: completion in the second week of February, mortgage redeemed, first tranche released. The couple flew out five weeks later.

The works finished in the last week of April. The house went to market in the first week of May at £2.35m, received two offers in June and completed in September, month eight of the facility, at £2.3m. The bridge, eight months of rolled interest and the fee were repaid from the proceeds and the balance was transferred to the couple.

Questions about this case

Can you get a bridging loan to refurbish your home before selling it?

Yes. A regulated refurbishment bridging loan is secured on your home, repays any existing mortgage, and releases the cost of the works in stages against a valuer’s sign-off, with the sale of the finished property as the exit. This couple borrowed £1.5m against a £1.9m house, spent £180,000 on works and sold at £2.3m in month eight.

Is a bridging loan still regulated if the owners move abroad during the term?

Yes. The loan is regulated by the FCA under the mortgage rules because it is secured on the borrowers’ home at the point it is taken out, and the property was not being let. The lender required a UK solicitor and a UK-based project manager holding a limited power of attorney for the works and the sale, and accepted that the borrowers would be living in Singapore for most of the term.

How did the lender lend 79% of the current value on a regulated bridge?

It did not on day one. The initial drawdown of £1.26m was 66% of the £1.9m pre-works value. The two further works tranches and the rolled interest allowance took the facility limit to £1.5m, which the lender tested at 64% of the £2.35m post-works valuation, with each tranche released only after the valuer confirmed the scheduled works had been completed.

Was refurbishing before sale worth the cost of the bridging loan?

In this case, yes, by around £180,000 after the works, eight months of interest, the fee and agent’s commission, plus the mortgage payments avoided. The decision rested on three agents independently valuing the house at £1.8m as-is and £2.3m to £2.4m finished. Where the uplift is less than the cost of the works plus a year of interest, we advise against it.

How was the interest paid while the owners were living abroad?

It was rolled up and added to the balance, so there were no monthly payments and no currency risk on a monthly debit from a Singapore salary. Interest only accrued on money that had been drawn, so the two undrawn works tranches cost nothing until they were released. The whole balance was repaid from the sale proceeds in month eight.

What happens if the works overrun or the house does not sell within 12 months?

The facility was stressed at a £2.0m sale in month twelve, which still repaid the loan with around £500,000 to spare. A fixed-price building contract signed before completion protected against cost overruns, and the lender would consider an extension or a re-bridge at this loan to value if the sale took longer. Neither was needed.

The outcome

The mortgage was repaid and the works funded 19 working days after the first call, five weeks before the couple left for Singapore. The refurbishment ran to schedule from abroad through a local project manager, with the two further tranches released on time. The finished house went to market in May and completed at £2.3m in September, month eight of the twelve-month facility, against an as-is price of £1.8m. After the bridge, the works, the interest and the fee were repaid, the couple netted around £180,000 more than selling as it stood and made no mortgage payments from abroad.

Completed transaction. This case study describes a live deal arranged by Fox Davidson. Client details are anonymised and figures rounded.

Rates quoted are indicative and subject to change. Actual rates depend on individual circumstances, security, and lender appetite at the time of application. Your home may be repossessed if you do not keep up repayments on a mortgage or any other debt secured on it.

Selling a tired house and leaving money on the table, or relocating before the sale completes? We arrange regulated refurbishment bridging loans from £250,000 across England, Scotland* and Wales, with no broker fee.

Call 03300 100313

*Minimum loan for Scotland bridging, commercial and development finance cases is £1,000,000, on mainland Scotland in and around Glasgow, Edinburgh and other major cities. We do not arrange finance in Northern Ireland.

Get in Touch

Recent case studies

Loading...

Get in Touch