A £2.6 million conversion facility for a mixed retail and office building in Hemel Hempstead, Hertfordshire, turned into 10 homes at about 67% of a GDV of around £3.9 million. Prior approval and the town’s transport links did the heavy lifting on the sales, while asbestos removal and the council’s conditions on external appearance added cost and time to the programme.
| Location | Hemel Hempstead, Hertfordshire |
| Loan amount | £2,600,000 |
| GDV (approx) | Around £3,900,000 |
| Loan to GDV (approx) | About 67% |
| Project | Retail and office building converted into 10 residential units |
| Planning route | Prior approval |
| Exit | Sales of the completed units |
The situation
This was a commercial building in Hemel Hempstead with retail and office space, and the client’s plan was to turn it into ten residential units for sale. The facility came in at £2.6 million against a gross development value of around £3.9 million, which put the loan at about 67% of GDV, a level I would describe as sensible for a conversion of this size where the lender still has to price some risk in the existing building.
Hemel is a commuter town, and the train into London and the road links around the M1 and M25 are a big part of why people buy there. When I first looked at the scheme I was more interested in who would buy the finished units than in the building itself, because on a ten unit scheme the sales rate decides how the last part of the facility behaves.
Why the scheme stacked up
The prior approval route and the good transport links were what supported the sales, and both carried weight with the lender. Prior approval gave a clear answer on the principle of residential use without the time and uncertainty of a full planning application, and the transport links gave the valuer a straightforward story to tell about demand from buyers who work elsewhere and want an easy commute.
Mixed retail and office buildings can be awkward to appraise, because the two uses were often built or altered at different times and the layouts do not always line up floor to floor. What we usually find is that a credit team will spend more time on the drawings for a building like this than on a purpose built office block, and having the architect’s layouts and the cost plan ready before the case goes to a lender shortens that conversation a great deal.
The challenge: asbestos and the outside of the building
Asbestos removal and the external appearance conditions imposed by the council increased both the cost and the programme. Neither is unusual on a commercial building of this age, but together they put pressure on the timeline from two different directions, one inside the building and one on its face.
Speaking generally, any building put up before 2000 may contain asbestos, and before strip-out a refurbishment and demolition survey is needed to find it, with certain types only removable by a licensed contractor under controlled conditions. The removal has to happen before most of the other trades can start, so it sits right at the front of the programme where a delay costs the most.
External appearance is a different kind of problem. Councils can attach conditions on materials, windows and how the elevations look, and on a town centre building those conditions can mean specialist products or extra design work that the original budget did not carry. I always tell clients to read the conditions with the cost plan open on the desk next to them, because a single line about window frames can be worth a lot of money.
How the facility works through delays like these
In general terms a conversion facility releases the works money in stages, certified by a monitoring surveyor, so when asbestos removal or an external design change pushes the programme out the drawdown timetable moves with it. What matters to the lender is that the cost plan is kept honest and that any overrun is explained early, along with how it will be paid for, because a lender who hears about a problem from the client is far more relaxed than one who finds it in a monitoring report.
Relationship is everything on a conversion. The lenders we place these schemes with know that commercial buildings throw up surprises, and the deals that keep moving are the ones where the broker has told the lender the full story from the start and kept them up to date as the works progress.
Selling ten units to commuters
The sales story was the transport links, and it held. Ten units is enough that the sales period matters, since the facility is repaid from the sale proceeds and the interest keeps running on the balance until the last unit goes, and a commuter town with a good train service gives buyers a reason to look at a converted building alongside the new build stock nearby.
The outcome
A £2.6 million conversion facility at about 67% of a GDV of around £3.9 million, turning a retail and office building in Hemel Hempstead into 10 residential units. The prior approval route and good transport links supported the sales, with asbestos removal and the council’s external appearance conditions adding cost and time that the scheme absorbed.
Frequently asked questions
Can a mixed retail and office building be converted under prior approval?
Often, yes. Shops and offices now both sit within Class E, and the Class MA prior approval right allows Class E buildings to change to residential, subject to the council assessing matters such as transport, contamination, flood risk, noise and natural light. Each building has to qualify on its own facts, so planning advice should be taken before purchase.
How does asbestos affect a conversion finance application?
Lenders expect a building of any age to be surveyed, and a refurbishment and demolition survey before strip-out is standard on older commercial buildings. The cost of licensed removal should be in the cost plan from the start. Asbestos does not usually stop a lender funding a scheme, but an unbudgeted removal cost and the delay it brings will be questioned.
Can the council impose conditions on a prior approval conversion?
Yes. Councils can attach conditions to prior approvals, and separate consent may be needed for external changes such as new windows or altered elevations. Conditions on materials and appearance can add cost and time, so they should be priced into the appraisal before the facility is agreed.
Completed transaction. This case study describes a live deal arranged by Fox Davidson. Client details are anonymised and figures rounded.
Rates and lending criteria are subject to change by lenders without notice. Your property may be repossessed if you do not keep up repayments on a mortgage or any other debt secured on it.
We arrange commercial to residential conversion finance from £250,000 across England, Scotland and Wales, including Hertfordshire and the commuter towns around London.
*Minimum loan for Scotland bridging, commercial and development finance cases is £1,000,000, on mainland Scotland in and around Glasgow, Edinburgh and other major cities. We do not arrange finance in Northern Ireland.