For purchases and remortgages, Fox Davidson can secure a rate for you now. We can then review rates for you before completion and if they have dropped we will request the lender moves you to the lower rate. Get in Touch

Change of Use Planning Permission: Rules, Permitted Development and Finance

Moving within a use class is not development; a material change needs consent or permitted development. How change of use works and how lenders fund it.

Last updated: 15 November 2026

You need planning permission for a change of use when it is a material change, which in practice means moving a property from one use class to another; moving within the same class is not development at all. In England, some changes between classes are granted nationally as permitted development, often subject to prior approval. Lenders will fund a change of use once a valid consent or prior approval is in place, typically on a bridge or development facility.

Same classno permission needed
56 dayscouncil decision period for prior approval
England onlyClass MA and Class E
0.77% pmaverage bridging rate, Q3 2026

When do you need planning permission for a change of use?

When the change is material, and there is no permitted development right that covers it. There is no statutory definition of material change. The government's guidance says it depends on the significance of the change and its impact, decided case by case. The working test is the use class. The Use Classes Order groups uses that are broadly similar, and the guidance is clear: "movement from one primary use to another within the same use class is not development."

So in England a shop can become a café, gym, office or clinic without permission, because all sit in Class E. A shop becoming a house is a change of class, from E to C3, so it needs either planning permission or a permitted development right such as Class MA. Uses outside any class are sui generis, and a change to or from a sui generis use usually needs a full application.

Two traps. A planning condition on an earlier consent can remove the freedom to move within a class. And an Article 4 direction can withdraw a permitted development right in a defined area, although it cannot stop changes within the same class.

What are the main use classes in England?

England has used Class E, F1 and F2 since 1 September 2020; Wales and Scotland have their own orders.

ClassCoversLender view
B2 / B8General industrial; storage and distributionStrong appetite for well let units
C1Hotels and guest housesSpecialist, trading business valuation
C2Residential institutions, such as care homesSpecialist, regulated operator
C3DwellinghousesWidest lender choice
C4Small HMOs, three to six residentsHMO buy-to-let lenders
EShops, cafés, offices, light industry, gyms, clinics, nurseriesMainstream commercial
F1 / F2Education, places of worship, halls, some local shopsLimited appetite
Sui generisPubs, hot food takeaways, large HMOs, theatres, petrol stations and othersCase by case

For how lenders view each class, see use classes and UK commercial lender appetite.

Which changes of use are permitted development?

In England, the General Permitted Development Order grants a set of changes nationally, most with conditions and prior approval. The ones property investors use most:

  • Class MA: Class E commercial to C3 homes. The building must have been in Class E use for two continuous years, it cannot be listed or in a National Park, National Landscape or World Heritage Site, and prior approval is required.
  • Class Q: agricultural buildings to homes, subject to limits on the number and size of homes. See our barn conversion finance guide.
  • Class L: between a house (C3) and a small HMO (C4), unless an Article 4 direction applies, which many university towns have.
  • Class R: agricultural buildings to a flexible commercial use.

Every new home created under permitted development must meet the nationally described space standard and have at least 37 square metres of floor space (article 3(9A) of the GPDO).

What is prior approval and how long does it take?

Prior approval is a lighter application where the council can only consider set matters, and it has 56 days to decide. For Class MA those matters are transport, contamination, flooding, noise from nearby commercial premises, natural light to every habitable room, the effect on industrial areas, the loss of a registered nursery or health centre, the impact of ground floor change in a conservation area, and fire safety on taller buildings. If the council does not decide within the period, the development can generally proceed, but lenders will want that confirmed by your solicitor. Fees are set nationally, charged per new home for Class MA and rise each April, so check the current figure on the Planning Portal before you submit.

How does change of use work in Scotland and Wales?

Both have their own use classes orders, and neither has Class E or Class MA.

Wales still uses the older classes: A1 shops, A2 financial and professional services, B1 business and so on. Welsh permitted changes to housing are narrow, such as a flat above an A1 or A2 unit. Converting a commercial building to homes generally needs a full application. Wales also has C5 (second homes) and C6 (short-term lets) classes, which councils can bring into force locally through Article 4 directions.

Scotland uses the Use Classes (Scotland) Order 1997. Since 2023 shops and financial and professional services have been merged into Class 1A. The Scottish Government consulted in September 2025 on a new permitted development right for homes in town centre commercial buildings, possibly limited to upper floors. Check whether it is in force for your site; otherwise full planning permission is required.

How do you finance a change of use?

A bridge buys the building and funds light works; a heavy refurbishment bridge or development facility funds the conversion; a term mortgage or sale repays it. What the lender needs first is a valid consent: full planning permission or a prior approval with its conditions understood. Many lenders will lend against the existing use value before consent and against the converted value after it.

StageTypical financeWhat the lender looks at
Buy before consentBridge on existing use, 60% to 70% LTVCurrent value, planning prospects, exit
Buy with consentHeavy refurbishment bridge or development financeWorks budget, contractor, GDV, LTC and LTGDV
After worksCommercial or buy-to-let term loan, or saleRent cover, unit sizes, warranties

Model example, figures rounded and illustrative, not a live quote

Vacant office in England, Class MA prior approval granted for eight flats. Purchase £1,200,000. SDLT at non-residential rates £49,500. Works £900,000. Gross development value £2,600,000.

A heavy refurbishment bridge at 70% of the price (£840,000) plus 100% of works (£900,000) would be £1,740,000, but the lender caps the facility at 65% of GDV: £1,690,000.

Total cost before finance and fees: £2,149,500. The developer funds about £459,500 plus fees and interest. If the flats sell at £2,600,000 and finance and sales costs come to £250,000, the margin is about £200,500, or 7.7% of GDV. Most lenders would want closer to 15% to 20%, so the price or works budget needs to fall.

The example shows why lenders test the appraisal before the building. Run your own figures through the development finance calculator and the bridging calculator, and read commercial to residential conversion finance for how those facilities are structured.

What makes a change of use scheme hard to finance?

Small units, uncertain consent and an exit that depends on a niche buyer. Flats close to the 37 square metre minimum narrow the buy-to-let exit, because some term lenders set their own minimum sizes. Prior approvals with unresolved conditions, schemes in industrial areas with noise issues, and buildings where the two year Class E history cannot be evidenced all reduce appetite. Converted homes also need building regulations approval, because a change to dwellings is a material change of use under the Building Regulations, and lenders expect a warranty or professional consultant's certificate on the finished units.

Frequently asked questions

Do I need planning permission for a change of use?

Yes if the change is material and no permitted development right applies. Moving between uses in the same use class, such as shop to office within Class E in England, is not development and needs no permission.

How long does a change of use application take?

A prior approval application under permitted development has a 56 day determination period. A full planning application for a change of use has a statutory target of eight weeks for most minor schemes, though many councils take longer.

What is Class MA?

A permitted development right in England that allows a building in Class E use for at least two continuous years to become homes, subject to prior approval and the nationally described space standard.

Does Class MA apply in Scotland or Wales?

No. Class MA is England only. Wales and Scotland have their own use classes orders, and commercial to residential conversions there generally need full planning permission.

Will a lender fund a building before change of use is approved?

Yes, usually on a bridge sized on the existing use value. The loan can then be increased or refinanced once consent is granted.

Is a prior approval as good as planning permission for a lender?

Most development and bridging lenders accept a valid prior approval. They will check its conditions, the space standards and the time limit for completion, which is three years for Class MA.

Rates and lending criteria are subject to change by lenders without notice.

Planning rules from GOV.UK planning practice guidance and the GPDO 2015 as amended on legislation.gov.uk (Class MA latest version 27 January 2026); Wales from Carmarthenshire County Council guidance; Scotland from the Scottish Government's September 2025 consultation; SDLT from GOV.UK; Bridging Trends Q3 2026. All checked 27 October 2026. Nothing here is a recommendation or tax/legal advice. Your property may be repossessed if you do not keep up repayments on a mortgage or any other debt secured on it. Fox Davidson arranges finance from £250,000 in England, Scotland* and Wales.

Fox Davidson funds change of use schemes from £250,000 through bridging and development finance, with no broker fee where the lender pays us commission. Send us the consent or prior approval and your figures and we will tell you what a lender will advance.

Call 03300 100313

*Minimum loan for Scotland bridging, commercial and development finance cases is £1,000,000, on mainland Scotland in and around Glasgow, Edinburgh and other major cities. We do not arrange finance in Northern Ireland.

Speak to us

Talk to us about your development finance

Tell us the loan size and what you are buying, building or refinancing. We call you back to talk through which lenders fit the deal, the likely terms and what each lender will ask for.

  1. Tell us about the case. Two minutes on the form, or call us.
  2. We match the lenders. We test the deal against development finance lenders across the market, then call you with the options.
  3. We package and submit. One complete application to the lender you choose, managed through to offer and completion.

03300 100313Monday to Thursday 9am to 5pm, Friday 9am to 4pm. Closed weekends.

“Due to slightly challenging employment status (startup founder) we were really struggling to secure a suitable mortgage going through 5 mortgage brokers before we found Fox Davidson.”
Tom G, Google review
“Fantastic service, completed our mortgage from initial enquiry to formal offer within a calendar month.”
Mark G, Google review
“Fantastic, fast, and able to secure a better mortgage for us than others.”
Jack W, Google review

Request a callback


    We use your details only to respond to your enquiry. See our privacy notice.