Development Finance Broker London
London development finance from £250,000, with Gateway 2 bridges, CIL and affordable housing built into the pack. No broker fee where the lender pays us.
Last updated . Written by Wesley Davidson, director of Fox Davidson Limited.
A development finance broker in London sources and structures the staged loans that fund land, build and conversion costs on London schemes, then manages the lender, the monitoring surveyor and the drawdowns through to practical completion and exit. Fox Davidson arranges London facilities from £250,000, from eight-flat infill schemes in the outer boroughs to higher-risk residential blocks waiting on the Building Safety Regulator. Call 03300 100313.
We are a specialist development finance broker, and London is where the planning, building safety and CIL costs do the most damage to an appraisal that has not been built properly, so most of our work on a London file happens before a lender sees it. There is no broker fee where the lender pays us a commission, and any fee is agreed in writing before you commit.
Got a consent, a cost plan and a GDV for a London site? Send them over and we will tell you what the scheme will carry and which lenders fit.
Call 03300 100313£250,000
Up to 70%
Up to 90%
About 0.70% a month
6 to 24 months
None where the lender pays us
How much development finance can you raise in London?
Up to 90% of total cost and up to 70% of gross development value for an experienced developer, whichever produces the lower figure. On most London residential schemes the GDV cap binds first, because land is such a large share of the cost and rolled-up interest and fees count towards the cap.
First-time developers should expect around 70% to 75% of cost and 60% to 65% of GDV. Where the senior lender stops short, mezzanine finance or a joint venture equity partner can sit behind it, though every layer adds cost and an extra set of lawyers to the completion.
What we see on London schemes is that the developer's own figure for GDV and the valuer's figure drift apart more often than anywhere else we lend, because flat values have softened while house values have held, and the lender lends against the valuer's number. Build the appraisal on achieved sales from the last twelve months in the same postcode and you will rarely be surprised at valuation.
What does development finance cost in London?
From about 0.70% a month for prime residential with an experienced developer, 0.75% to 1.20% a month on standard residential and conversion schemes, and 0.85% to 1.30% a month for a first scheme. On top of the rate you pay an arrangement fee of 1% to 2%, the valuation, the monitoring surveyor and, on some offers, an exit fee.
Interest is rolled up into the facility rather than paid monthly, and most lenders charge a non-utilisation margin on undrawn build money instead of full interest. On a London scheme with an 18 month programme, the interest line is often bigger than the professional fees, which is why the term you ask for matters as much as the rate. A realistic programme with a sensible buffer is cheaper than an optimistic one that needs an extension.
Our development finance rates guide breaks down how lenders price each type of scheme.
Which lenders fund development in London?
Specialist development lenders, challenger banks, debt funds and, for smaller builders, Homes England, with the right one depending on the size of the facility, the planning route and whether the building is a higher-risk building. The high street banks still lend on London development, but usually at lower gearing, with pre-sales conditions and slower credit processes.
Lenders we place London development with include United Trust Bank, Shawbrook, Hampshire Trust Bank, Paragon, Close Brothers Property Finance and Octopus Real Estate for mainstream senior debt, LendInvest, Maslow and Avamore for faster or more flexible cases, and Blend Network and CrowdProperty for smaller schemes. Homes England's support for SME builders is worth looking at on schemes that fit its criteria. Appetite changes month to month, and a lender that was keen on outer London flats in the spring can be full by the autumn.
Our development finance lenders compared guide sets out how the main lender types differ on gearing, speed and experience requirements.
Rates and lending criteria are subject to change by lenders without notice.
How does Gateway 2 affect development finance in London?
On a higher-risk building, senior development lenders will not release construction money until the Building Safety Regulator has granted Gateway 2 approval, so the time spent waiting has to be funded separately. Under the Building Safety Act 2022, a new building in England is a higher-risk building if it is at least 18 metres high or at least 7 storeys and contains at least two residential units, a care home or a hospital (GOV.UK).
The statutory period for a new build Gateway 2 decision is 12 weeks. The Regulator's own data to 31 August 2026 shows a national median of 22 weeks for new higher-risk buildings and conversions, and 23 weeks for non-complex London cases, with London accounting for 31 of the 50 new build decisions made in that 12 week period (Building Safety Regulator). The approval rate on new builds was 92%, against 39% twelve months earlier, so the regime is improving, but complex cases still had a median of 33 weeks.
That is the problem our £12m London MUFB case solved. Planning was in place, enabling works had gone as far as the regime allows, and the senior lender's approval was conditional on Gateway 2. We arranged a £12 million bridge at 68% gross loan to value over 18 months with the development facility agreed in principle behind it, and modelled three exit cases, with approval at months 9 to 12, at months 15 to 17, or not inside the term, with extension terms agreed up front for the worst case.
My advice to any developer with a higher-risk building in London is to take the development lender's heads of terms to the bridging lender at the outset, not to arrange the bridge first and look for the refinance later. Arranging both together is what got terms agreed in about four weeks on that file, and it means the bridging underwriter is lending against a real exit rather than a hope. Our Gateway 2 bridging finance guide covers the regime in more depth.
Below 18 metres and 7 storeys, Gateway 2 does not apply and building control approval runs through the normal route. On a marginal site, the decision to stay at six storeys rather than seven can change the finance as much as the design, so talk it through with your architect and with us before the scheme is fixed.
What do affordable housing and CIL add to a London scheme?
Often more than the developer budgeted for, and the lender's quantity surveyor will find both, so put them in the appraisal as named lines with their payment dates mapped against the drawdowns. London has two layers of CIL and an affordable housing regime that changed twice in 2026.
The threshold approach. Under the current London Plan, schemes that provide 35% affordable housing, or 50% on public land and industrial land, can take the Fast Track Route and avoid a detailed viability assessment at application stage. Schemes below the threshold go through the Viability Tested Route, which takes longer and adds review mechanisms.
The 2026 emergency measures. On 25 March 2026 the government and the Mayor announced a temporary fast-track route for London sites delivering at least 20% affordable housing, open to validated applications submitted by 31 March 2028, with temporary CIL relief for eligible schemes that commence before 31 March 2030 (GOV.UK). A draft new London Plan was published on 16 July 2026, proposing borough bands of 35%, 25% and 20%, and is not expected to be adopted before 2028.
Mayoral CIL. MCIL2 has applied to planning permissions granted since 1 April 2019 and repays the borrowing that built the Elizabeth line. The base rates are £80, £60 and £25 per square metre depending on the borough band, with higher rates for office, retail and hotel space in central London and the Isle of Dogs, and every figure is indexed each year.
Borough CIL. Each borough sets its own charging schedule on top. Lewisham's 2026 indexed residential rate in its higher zone is £154.44 per square metre, for example, so on a 1,000 square metre scheme borough CIL alone runs to around £154,000 before the Mayoral charge. CIL falls due on commencement unless an instalment policy applies, and a six-figure payment landing in month one changes how the day-one tranche needs to be sized.
A London appraisal that leaves CIL as a footnote will not survive credit committee.
What does an illustrative London scheme borrow?
On the assumptions below, an eight flat scheme with a £4.8 million GDV borrows £3.12 million, with the GDV cap binding at 65% before the cost limit. The scheme is five storeys, so it sits under the higher-risk building thresholds and Gateway 2 does not apply.
Eight two-bedroom flats on a consented infill site in an outer London borough, selling at an average of £600,000. Assumptions: land £1,050,000, build £2,000,000, contingency 5%, professional fees 10% of build, Mayoral CIL, borough CIL and section 106 of £150,000, and £20,000 of valuation and monitoring costs. The lender lends up to 65% of GDV including rolled-up interest, charges an illustrative 0.80% a month compounded monthly over an 18 month term, and takes a 2% arrangement fee. Build and contingency are drawn evenly over 14 months.
| Item | Figure |
|---|---|
| Gross development value, 8 flats at £600,000 | £4,800,000 |
| Land, build, contingency, fees, CIL and section 106 | £3,520,000 |
| Day-one land advance | £669,857 (63.8% of land) |
| Build and contingency drawdowns | £2,100,000 |
| Rolled-up interest, 18 months | £287,743 |
| Arrangement fee, 2% | £62,400 |
| Gross facility | £3,120,000 |
| Loan to GDV / loan to cost | 65.0% / 80.6% |
| Total cost including finance | £3,870,143 |
| Your cash in the scheme | £750,143 |
| Profit after 2% sales costs | £833,857 (17.4% of GDV) |
Illustrative only. Not an offer or a quote.
Two things move this scheme more than the rate. Cut the GDV by 5% to £4,560,000 and the facility falls by £156,000, all of which you fund in cash. Add two storeys and the building crosses the higher-risk threshold, which brings Gateway 2, a longer pre-construction period and a holding facility into the numbers. Run your own figures through our development finance calculator and the developer profit calculator.
Can you fund an office to residential conversion in London under Class MA?
Yes, where the building qualifies and no Article 4 direction removes the right, and lenders treat a well-evidenced Class MA prior approval much like a full consent. Class MA allows a change from Class E commercial use to residential, subject to prior approval on matters including natural light to every habitable room and the nationally described space standard.
Since 5 March 2024, Class MA has no maximum floorspace limit and no three month vacancy requirement, which opened up larger and still-occupied London office buildings. The building still needs two years in Class E use before the application. Many London boroughs have confirmed Article 4 directions that remove the right in defined areas, and in 2022 the Secretary of State narrowed the directions in Kensington and Chelsea, Westminster, Wandsworth and Richmond, so check the borough's current position on the specific address before you exchange.
Two London-specific points catch people out. A conversion that creates flats in a building of 18 metres or 7 storeys is a higher-risk building, so Gateway 2 applies to the conversion. And deep-plan London office floors make the natural light test harder than it looks on a floor plan. Our £2.9m Old Market conversion in Bristol lost two units to keep every bedroom on a window wall, and the same discipline applies here. See commercial to residential conversion finance.
How do you fund a London site before planning or before Gateway 2?
With a bridge: a land bridging loan funds the purchase at up to around 65% of current value and is repaid by the first drawdown of the development facility. On a higher-risk building, the bridge also has to carry the scheme through the Gateway 2 wait, which can run well beyond the statutory 12 weeks.
The rule is the same either way. Agree the development lender's terms in principle before you bridge, so the exit is a credit-approved facility rather than an assumption. A London site bought at auction with no development lender lined up is the case we find hardest to rescue, because the bridge clock starts on completion day and London planning and building safety timetables rarely run to plan. See bridging loans in London and auction bridging finance.
Where planning is the risk rather than building safety, lenders price the bridge on the site's current value without consent, so the equity requirement is higher. Our guide to buying land with planning permission covers how consent changes what a site will borrow.
What exit strategies work for a London scheme?
Open-market unit sales, a dev-to-let refinance onto an investment facility, a block sale, or development exit finance at practical completion to buy time to sell at full value. On a London flat scheme in 2026, lenders want to see at least two of these credibly modelled.
HM Land Registry's September 2026 index puts the London average at £545,579, down 3.5% on a year, with flats and maisonettes at £420,985, down 6.3%, while house prices rose. That split is exactly what valuers are reading, and it is why a London flat scheme with only a sales exit gets a harder time at credit than a house scheme of the same size.
What we see on London schemes this year is developers holding completed flats rather than discounting them, refinancing at practical completion onto exit finance or a long-term investment facility while the sales market catches up. Development exit finance prices from about 0.60% to 0.90% a month because the construction risk has gone. For schemes designed to be held, see build to rent development finance, and for the mechanics, how development exit finance works.
Which London deals have we arranged?
Two of the cases below are in London, and the other three are the nearest comparable development schemes we have arranged, on the commuter belt. We would rather show you the nearest real deals, labelled as such, than dress up figures from elsewhere as London work.
| Deal | Area | Facility | Key terms |
|---|---|---|---|
| Gateway 2 bridge to development finance, higher-risk MUFB | London | £12,000,000 | 68% gross LTV, 18 months, development facility agreed in principle, terms in about four weeks |
| Below market value bridge on a 14-unit MUFB | London | £2,070,000 | 90% of a £2.3m purchase price, unregulated investment bridge |
| 24-unit new-build scheme, senior development finance | Guildford, Surrey | £14,200,000 | 68% LTC, 62% LTGDV, GDV £23m, 22 months |
| 24 apartments, senior development finance | St Albans, Hertfordshire | £8,900,000 | 66% LTC, 62% LTGDV, GDV £14.3m, 22 months |
| 16 completed apartments, development exit | Reading, Berkshire | £5,600,000 | 70% of £8m aggregate value, 12 months |
The Guildford and St Albans files share a pattern with London work. In both cases the client's bank offered lower gearing with conditions that did not fit the scheme, and the specialist market placed the full facility. We cover those markets on our Surrey development finance and Hertfordshire development finance pages.
Why use a development finance broker in London?
Because London schemes have more moving parts than anywhere else in the country, and the difference between a lender that understands them and one that does not shows up in the gearing, the conditions and how long credit takes. We have arranged property finance since 2005 and London has been part of the work throughout.
Once I understand a scheme, my role is to make sure the lender and its valuer understand it too, with the CIL liability notices, the section 106 triggers, the Gateway 2 status and the exit evidence laid out the way their credit team reads them, and that preparation is what moves a London file from a conditional maybe to a full offer. We put two or three lenders against each other on each case, then manage the monitoring surveyor and the drawdowns through to completion.
What we see across London enquiries is that around a third have already been to a lender direct and been declined or offered less than they need, usually because the pack was built for one lender's criteria and sent to another. Relationship is everything in this market.
If you are new to development, read our first-time developers guide first. For the wider London picture on values, boroughs and planning, our development finance in London guide is the companion to this page.
From the desk
“London is where the Building Safety Regulator has changed timelines most. Gateway 2 on higher-risk buildings has added months to some schemes, and lenders now price that wait into their terms. If you're buying a site that needs it, budget for a bridge to cover the gap and talk to us before you exchange, not after.”
Wesley Davidson, Director, Fox Davidson
A deal we completed: £12m London MUFB: Gateway 2 Bridge to Development Finance
What do London developers ask us most?
How much development finance can I raise in London?
Experienced developers can typically raise up to 90% of total cost and up to 70% of gross development value, whichever produces the lower figure. First-time developers should expect around 70% to 75% of cost and 60% to 65% of GDV. On London schemes the GDV limit usually binds first. We arrange development finance from £250,000.
What does development finance cost in London?
Rates start from about 0.70% a month for prime residential schemes with an experienced developer, run from 0.75% to 1.20% a month on standard residential and conversion schemes, and from 0.85% to 1.30% for first-time developers. Expect an arrangement fee of 1% to 2%, valuation and monitoring surveyor costs, and an exit fee on some offers. Rates and criteria change without notice.
Will a lender fund my higher-risk building before Gateway 2 approval?
Senior development lenders will not usually release construction drawdowns until the Building Safety Regulator grants Gateway 2 approval. The wait is normally funded with a bridge, with the development facility agreed in principle behind it. We arranged a £12 million bridge at 68% gross loan to value over 18 months on exactly this basis for a London MUFB.
How long is Gateway 2 taking in London?
The statutory period for a new build decision is 12 weeks. The Building Safety Regulator's data to 31 August 2026 shows a median of 23 weeks for non-complex London new build cases and 22 weeks nationally, with complex cases taking a median of 33 weeks. Build that range into your bridge term.
Which buildings count as higher-risk buildings?
A new building in England is a higher-risk building if it is at least 18 metres high or at least 7 storeys and contains at least two residential units, a care home or a hospital. Below those thresholds the scheme goes through normal building control and Gateway 2 does not apply.
How do Mayoral CIL and borough CIL affect my facility?
London schemes pay Mayoral CIL, known as MCIL2, at base rates of £80, £60 or £25 per square metre depending on the borough, indexed each year, plus the borough's own CIL. Both usually fall due on commencement, so lenders want them in the appraisal as named costs and mapped against the drawdown schedule.
What affordable housing do London schemes need to provide?
Under the current London Plan, the Fast Track Route applies at 35% affordable housing, or 50% on public land and industrial land. Emergency measures announced on 25 March 2026 added a temporary fast-track route at 20% for applications validated by 31 March 2028. A draft new London Plan published in July 2026 proposes borough bands of 35%, 25% and 20%.
Can I get development finance for an office to residential conversion in London?
Yes, where the building has two years of Class E use, no Article 4 direction removes Class MA rights at the address, and prior approval is granted. Lenders want natural light and space standard compliance proved before credit. If the converted building is 18 metres or 7 storeys with two or more flats, Gateway 2 applies.
Do you charge a broker fee on London development finance?
There is no broker fee where the lender pays us a commission. Where a lender pays nothing, any fee is agreed with you in writing before you commit to anything.
What happens if my London flats do not sell by the end of the term?
Development exit finance can replace the development facility at practical completion, priced from about 0.60% to 0.90% a month because the build risk has gone. It buys time to sell at full value rather than discounting. A dev-to-let refinance onto an investment facility is the other main route.
What else should London developers read?
Rates and lending criteria are subject to change by lenders without notice. Figures are indicative and depend on the scheme, the location, the developer's experience and the lender. Worked examples are illustrations, not offers. Your property may be repossessed if you do not keep up repayments on a mortgage or any other debt secured on it.
Send us the consent, the appraisal and the build cost plan for your London scheme. We will tell you within a day what gearing it supports, which lenders fit and what it costs.
*Minimum loan for Scotland bridging, commercial and development finance cases is £1,000,000, on mainland Scotland in and around Glasgow, Edinburgh and other major cities. We do not arrange finance in Northern Ireland.
Talk to us about your bridging, commercial or development finance
Tell us the loan size and what you are buying, building or refinancing. We call you back to talk through which lenders fit the deal, the likely terms and what each lender will ask for.
- Tell us about the case. Two minutes on the form, or call us.
- We match the lenders. We test the deal against bridging, commercial and development lenders across the market, then call you with the options.
- We package and submit. One complete application to the lender you choose, managed through to offer and completion.
03300 100313Monday to Thursday 9am to 5pm, Friday 9am to 4pm. Closed weekends.
“Due to slightly challenging employment status (startup founder) we were really struggling to secure a suitable mortgage going through 5 mortgage brokers before we found Fox Davidson.”
“Fantastic service, completed our mortgage from initial enquiry to formal offer within a calendar month.”
“Fantastic, fast, and able to secure a better mortgage for us than others.”